- ES-ARE108XW3-E24 - Alloys

Elite Screens - ES-ARE108XW3-E24

Supplier Product Code:
ARE108XW3-E24
108" MOTORISED 16:10 PROJECTOR SCREEN WITH LONG LEADER TENSI ONED, AERIE TENSION
RRP $3,669.00 inc GST
To purchase this item, please login to your Alloys account.
Elite Screens Aerie Tension ARE108XW3-E24 108" 16:10 In-ceiling Tensioned Powered Screen is the perfect solution for concealed in-ceiling Home Theater, ProAV, and Custom Installation.

CineWhite

CineWhite has broad light dispersion through diffusion uniformity, black & white contrast and true color rendition making it the most versatile material in Elite’s tension screen product lines. This tension PVC surface is the best choice for today’s high-contrast ratio projector in commercial or residential presentations. The CineWhite™ matte white material equals the performance to our MaxWhite product, but improves the experience with superior surface flatness. Uniform diffusion surface has black-backing to eliminate light penetration and is easily washable with mild soap and water.

Screen Material

  • Award winning CineWhite 1.1 Gain black backed matte white screen material
  • 160º wide-viewing angle
  • Tab-tension cords provide uniform flatness on entire projection surface
  • Available in various diagonal sizes and aspect ratios
  • Optional custom sizes and materials available thru our Custom Screen Request Order Form

Design and Installation

  • Disappearing in-ceiling design for non-dedicated media rooms
  • Integrated ceiling projection screen ships fully assembled, ready to install
  • Aluminum housing with white finish is strong and moisture resistant
  • Below and above ceiling access installation design
  • Instllation kit included

Control System

  • Internal Radio Frequency/Infrared receivers with IR, RF remotes included
  • Low voltage 3-way wall switch and in-wall RJ45 module included
  • Standard 5-12 volt trigger to synchronize screen operation with the projector's power cycle

Quality and Reliability

  • ETL, FCC, CE, CB GOSTCE & ISO9001:2008
  • Conforms to UL 2043 - Plenum Rated: Suitable for air-handling spaces