- ES-ARE126XW3-E14 - Alloys

Elite Screens - ES-ARE126XW3-E14

Supplier Product Code:
ARE126XW3-E14
126" MOTORISED 16:10 PROJECTOR SCREEN WITH LONG LEADER TENSI ONED, AERIE TENSION
RRP $4,449.00 inc GST
To purchase this item, please login to your Alloys account.
Elite Screens ARE126XW3-E14

Elite Screens Aerie Tension ARE126XW3-E14 126" 16:10 In-ceiling Tensioned Powered Screen is the perfect solution for concealed in-ceiling Home Theatre, ProAV, and Custom Installation.


Key Specifications:
  • Award winning CineWhite 1.1 Gain black backed matte white screen material
  • 160¼ wide-viewing angle
  • Tab-tension cords provide uniform flatness on entire projection surface
  • Available in various diagonal sizes and aspect ratios
  • Disappearing in-ceiling design for non-dedicated media rooms
  • Integrated ceiling projection screen ships fully assembled, ready to install
  • Aluminium housing with white finish is strong and moisture resistant
  • Below and above ceiling access installation design
  • Internal Radio Frequency/Infrared receivers with IR, RF remotes included
  • Low voltage 3-way wall switch and in-wall RJ45 module included